Showing posts with label A bit crotchety. Show all posts
Showing posts with label A bit crotchety. Show all posts

Sunday, 30 December 2018

The Return of the Plan... and the Blogger

grid of makenine2019 plans
MakeNine2019 plans, part one. This is my year; I can feel it.
Well, well, well, look who's blogging again. I started putting my 2019 #makenine plans on Instagram, but I realized it was rapidly turning into a essay worthy of an actual blogpost. So here you have it: my first post in over a year.* Let us glory in its length.

This is part one of my Make Nine, actually -- the Make Nine quickly morphed into a Make Twenty-Seven -- but I'm only allowing myself to get to part two once I've finished at least 2/3 of part one. As always, these are more project/fabric/yarn-based than pattern-based, although I usually have patterns in mind when I buy fabric and yarn. The goal is to seriously sew down the stash, because somehow during the move 5 bins turned into 15 and I've been steadily adding to it since; I'm getting antsy and the DC is climbing the walls because the piles are getting bigger, not smaller. And I am seriously on a fabric ban until next August (unless I need some underlining -- see #5 below).

the fabrics/yarns I will be using
This is a very small portion of what I need to sew/crochet up.
Are you sitting comfortably? Then I'll begin.

Saturday, 8 April 2017

Pledgin' & plannin': Me-Made May '17


me-made-may'17

I, aem2 of PhysicsGirl on the Loose and @aem2_ on IG, sign up as a participant of Me-Made-May '17. I endeavour to wear 2 me-made/refashioned items each day for the duration of May 2017, repeating an item no more than once per week and without planning. I also pledge to sew at least one new item and finish one of my UFOs.

This is nearly the same pledge as last year, except that I am finally admitting my limitations and know that if I couldn't finish my sewing plans and UFOs last year when I had nothing but free time, there's no way I will finish all my UFOs and planned things to sew when I've barely had time to breathe this year. So, I'm only planning to sew one new thing and finish one UFO. I will also be taking pictures around the city using Fat Mum Slim's Photo-a-day prompts. There's no Flickr group this year, so I'll be doing my usually weekly round up here and possibly daily on IG.

I haven't sewn anything since last July, so this will be a bit of a challenge. I have many planned things to sew, too. Some of them are even cut out. Sadly, many of them are the same as last year's plans, which pretty much proves my point. I'm presenting them from most-likely to be finished to least-likely. I'm limiting my plans to things where I already have the fabric ready to go and where I can wear it in the next few months (so all that grey wool flannel will have to wait).

  • I cut out two Swoon cardigans last December: one in teal merino and another eked out of a grey sweater knit acquired from Andie. I'm actually hoping to sew both of these this month, but I'm leaving my options open. I don't know why I didn't include these in my #2017MakeNine -- had I managed to sew them in the first few days of January, I would have at least been able to check something off.

    Moot point, anyway.

  • White Mathilde blouse. I cut this out a few weeks ago and I could easily sew this in increments, so this might be The One.

  • A McCall's 8789 sheath in tan check that I cut out 3 years ago.

  • I have one pair of viable jeans, my yet-to-blogged-but-when-I-do-it-will-be-back-dated Jalie pair. I need more pairs desperately and have the denim ready to go. The pattern needs to be modified at the waist. I'd love to be able to at least have these cut out before the end of the month.

  • Tiramisu in blue/green abstract knit that I bought in Montreal two summers ago. Realistically, this is probably a June project.

  • I have a pair of RTW black capris in swishy but sweaty polyester that I've been wanting to copy in a breathable linen. I bought the linen at Mood last June, so now all I have to do is make a pattern from the original. No biggie, right?

    As for UFOs, they are legion, but I'd like to at least finish my glen laid Thurlow trousers. The waistband needs to be partially unpicked and the darts deepened.

    I am also going to attempt one back-dated post per week; the jeans might finally get their day in the limelight.

    Fingers crossed.


  • Wednesday, 4 January 2017

    Making nine... plus a little bit more

    Happy perihelion, everyone! To celebrate, I'm jumping on board the #2017makenine bandwagon, because I like planning. Whether I will have time to finish them is another question.

    Oh yeah, I'm on Instagram as @aem2_. Yes, I finally joined the 21st century.

    A post shared by Andrea M (@aem2_) on



    These are all things I've been planning for a while, and I even have fabric for most of them. Tops: Sewaholic Renfrew in black merino, Tilly and the Buttons Mathilde in white, Muse Jenna in chocolate brown merino. Bottoms: Jalie jeans; Simplicity trumpet skirt in grey flannel wool; Sewaholic Thurlows in likewise. Outers: Sewaholic Cyprus cape and Robson trench, and ClosetCase Files Clare coat.

    If I get nothing else made this year, I really, really need a new pair of jeans. I have to take in the waist and let out the butt on the pattern, which is why I've been putting it off.

    Naturally, my plans extend beyond these nine. Especially since I've got two Swoon cardigans cut and ready to be sewn, although I'm hoping to sew those before I go back to work on Monday, which is sort of why I'm not counting them in my nine. I have so many plans, but other than the outerwear and white t-shirts, I'm trying to limit myself to the ones where I have the fabric/yarn already, since I'm running out of fabric storage space.

  • Swoon cardigans in teal merino and grey sweater knit
  • Cake Tiramisu in blue/green abstract knit
  • even more jeans... I've got enough denim for four pairs
  • socks: I need to make the second of Aged P's Sidney's sideways socks plus a pair for me, Magic Bean Stalk-ings
  • Asymmetric cardigan in white acrylic from Aged P

    UFOs to finish:
  • Sewaholic Thurlow in tan glen plaid
  • My granddad pants need to have the zipper replaced
  • McCall's 8789 sheath in tan check
  • NL6000 sassy librarian dress in navy suiting & white linen
  • Sewaholic Alma
  • Plus many things where I need to resew a seam and add buttons. Ugh.

    I'm not going to plan these out, even though that's usually how I guarantee that they will get done, because I don't want to either rush the make or feel guilty if I don't get it done in time. The only thing I really need to finish is Aged P's second sock in time for her birthday.

    Here's hoping.

  • Saturday, 31 December 2016

    2016: Still waters running deep

    Things have been a little... quiet... on the blog lately. As predicted, school has been kicking my butt time-wise, but I did do some things this past year. I'm going to make a concerted effort in the new year to follow my original goal of blogging on average once a week. Many posts are currently sitting in the drafts folder, but they will see the light of day. Maybe even this year.*

    On with the yearly wrap-up. It was a year. The consensus is that it sucked globally, but personally, it was pretty good. I had 8 months of vacation, followed by 4 months of making up for it in spades. The DC and I celebrated our first anniversary as married adorables and my cat Lucy celebrated her 17th birthday by finally realizing that she has massive arthritis in her hips and so therefore shouldn't be leaping from the sewing table to the ironing board and that she could, in fact, pee on this.

    Sunday, 15 May 2016

    Make up your mind, May: MMMay16 week 2

    MMM16 week 2 composite

    me-made-may'16

    It's Spring in Ontario: one day slightly chilly, next day beautifully warm, then we plunge down to near-freezing with threats of snow and actual hail. Good times. Clothes were worn. It's halfway through Me Made May!

    Sunday, 8 May 2016

    Eight Days a Week: MMM16 week 1

    MMM16 week 1 composite

    me-made-may'16

    This year's MMM will be interesting because I'm not going into to work so I have no real reason to get out of my jammies other than to go outside and take pictures. Which, I'm hoping, will help get me out of my jammies. I've committed to wearing at least two me-made or refashioned items every day, with no more than one repeat per week, and make at least one item per week while finishing all my UFOs. This will be no problem, right? I'll be posting photos daily in the Flickr group and going into more detail on my weekly wrap-ups here. This week has eight days because for me, the week ends on Sunday. As always, I'm following Fat Mum Slim's photo prompts.

    I've also been taking the opportunity to catch up, timey-wimey wise, on some old blog posts and I've linked to a bunch of them below. Really, my aim is to keep you from doing whatever it is you should be doing by taking you on a kind of wiki walk.

    Thursday, 10 March 2016

    A warm, cuddly sweater just in time for Spring

    Posted timey-wimey-wise two months later.
    Dana front

    I've been planning to make the Dana sweater from Interweave Crochet winter 2013 for over a year. I splurged last year on some Madeleinetosh Sock in Norway Spruce, which is blue with hints of green undertones. I would occasionally pet it, but I didn't really feel I could start it until I had finished the DC's waistcoat. That project was mostly done by the end of January, so I finally wound a ball (I've started making centre-pull balls and they are the best) and got started. I crocheted this mostly before, on the way to, during, and on the way home from my trip to Florida with Aged P. I kept trying to take breaks, but this pattern was kind of addictive and I wanted the sweater sooo much. My Ravelry notes are here.